It’s old, broken, or inefficient as can be—whatever the reason is, your old air conditioner has to do, and a new one is getting installed soon enough. But you weren’t there the last time an AC was installed in this home, so what do you do now? What do you expect when installation day rolls around?
What does a cooling replacement installation typically involve?
- Removal of old system: Technicians disconnect and haul off your existing unit and tidy the area.
- New wiring and lines: Faulty or outdated connectors are replaced to ensure safe, reliable operation.
- Installation of the new AC unit: Indoor and outdoor components are assembled and integrated properly.
- System integrity testing: Leak checks and connection diagnostics help avoid refrigerant or pressure issues.
- Final performance test: Technicians confirm proper airflow, venting, and temperature output before cleanup.
Getting AC installation in Brighton isn’t as daunting as you might think. Here’s a basic outline of what you can expect so you know what’s coming. Hopefully there will be no surprises along the way.
Removing Old AC Equipment
It’s time to get rid of that old unit. It served you well, but it’s done for—out with the old and in with the new. Your technicians will haul out the old air conditioner after disconnecting the ductwork. There will be a quick cleanup of the area to make sure installing the new unit goes as smoothly as possible. Then it’s time to move on to the right AC system for your home.
Installing New Lines & Wiring for Your AC
Chances are some of the wiring in your old air conditioner connection went bad in the last 10–15 years since it was installed. New wires will go in, and any lines that need to be installed or replaced will get the proper treatment. Replacing outdated components like these is just one of the key benefits of installing a new AC system ahead of the summer season.
What Happens During AC Unit Installation
Once everything looks right, your technician will install the new air conditioner. First, they’ll begin attaching what they can from the outside where the AC cabinet goes. Then the process involves some back-and-forth between the indoor elements and the outdoor parts of your air conditioner. Once everything is in place, we’re close to being done.
Verifying AC Line Connections During Install
Now that everything is installed, your technician will make sure it was all done properly. We don’t want a refrigerant leak springing up out of nowhere, so extra due diligence is in order. Your technician inspects the new lines and system’s integrity, then when it all looks right as rain, it’s time to move onto the final testing portion of your installation.
How AC Installers Test Venting & Pressure
Now that the hard part is out of the way, your technician needs to ensure the air coming out of your AC has the right temperature, ventilation works properly, that the air flow is strong, and that should be all.
If everything works as it’s supposed to, then you’re ready to enjoy your new air conditioner. Your technicians will clean up their tools and any debris, haul it all away, and leave you to enjoy your new temperature-controlled space.
Getting Ready for AC Installation Day
You’re ready for installation day. This is a basic outline for everything that’s going to happen, but there are always specific situations and problems that can pop up depending on your specific installation. If anything unexpected comes up, we can help you assess whether it’s best to move forward with a repair or consider replacing your current AC system altogether.
Fingers crossed that there’s no cause for concern and you’ll have a clean installation process. If not, you always have us to get it right back on track and make sure it’s as frictionless as can be.
Frequently Asked Questions
Question: What are the main steps involved in an air conditioner installation?
Answer: The process typically starts with removing your old unit and cleaning the area. Technicians then install new wiring and refrigerant lines as needed, followed by setting up the new AC unit. Finally, they test the system for proper airflow, temperature, and pressure before cleaning up and ensuring everything works well.
Question: How long does an air conditioning installation usually take?
Answer: Installation time varies by the system type and complexity. A central air system generally takes 4 to 8 hours, while ductless mini-split installations may take 1 to 3 hours per unit. More complex jobs involving ductwork or electrical upgrades could extend to a full day or more.
Question: What should I expect during the pre-installation assessment?
Answer: Technicians will assess your home’s cooling needs—looking at factors like size, insulation, ductwork, and electrical capacity. They’ll help choose the right system, manage permitting if needed, and schedule installation based on home layout and access.
Question: What happens after the AC installation is complete?
Answer: Once installed, the system undergoes testing—running cycles, checking airflow, pressure, and thermostat calibration. Technicians will walk you through the system’s features, explain maintenance needs, and provide warranty information before cleaning up and leaving your space tidy.
Question: Why is professional installation important for AC systems?
Answer: Professional installers ensure correct sizing, efficient setup, safe electrical and refrigerant handling, and compliance with codes. They reduce risks like improper charging, refrigerant leaks, or inefficient performance, ultimately extending system lifespan and optimizing comfort.
Contact the professionals at First Choice Heating & Cooling today to schedule your next air conditioner installation. If your home had a voice… it would call First Choice!